新聞中心
Home > News Center > Company News

How to operate the controlled atmosphere sealed box type of a multi-purpose furnace?
2024-09-20 08:57:24

The controlled atmosphere sealed box type operation method of a multi-purpose furnace includes multiple steps to ensure safe and efficient operation of the equipment. The following is a detailed description of the operation process:
1. Equipment preparation
Before starting, ensure that the furnace body is clean and dry, and check whether the sealing ring is intact to prevent gas leakage. At the same time, confirm that the temperature probe and heating element in the furnace are functioning properly.
2. Atmosphere selection and connection
Select a suitable gas (such as nitrogen, hydrogen, etc.) according to the experimental requirements. Connect the gas bottle to the gas inlet of the furnace body to ensure that the connection is tight and there is no leakage. Use a gas flow meter to adjust the gas flow to ensure a stable atmosphere environment.
3. Set parameters
Enter the required heating temperature, heating rate and insulation time through the control panel of the furnace body. Ensure that the set parameters meet the material processing requirements to avoid excessively high or low temperatures.
4. Load the sample
When the furnace body is cooled, place the sample to be processed in the ceramic crucible or high-temperature resistant material in the furnace, and ensure that the sample is evenly placed to facilitate heat distribution.
5. Sealing and closing
After loading the sample, close the furnace door and ensure that it is well sealed. Check the sealing ring and locking device to prevent gas leakage during heating.
6. Starting the furnace
Press the start button and the furnace will start heating. During the heating process, monitor the temperature regularly to ensure that the temperature rises steadily according to the set curve. Pay attention to the data on the control panel to ensure that there are no abnormalities.
7. Atmosphere monitoring
During the heating process, continuously monitor the stability of the atmosphere in the furnace. If the gas flow is abnormal or the gas concentration does not meet the requirements, take immediate measures to adjust it.
8. Insulation and cooling
When the set temperature is reached and maintained for a certain period of time, turn off the heating function and enter the cooling stage. Maintain the atmosphere in the furnace until the temperature drops to a safe level.
9. Removing the sample
After the furnace temperature drops to a safe range, open the furnace door and carefully remove the sample using high-temperature resistant gloves. Avoid touching high-temperature parts to prevent burns.
10. Equipment cleaning and maintenance
After removing the sample, clean the residue in the furnace and regularly check the gas pipeline and equipment function to ensure long-term safe operation. Record the operation data and experimental results for subsequent analysis and improvement.
By following the above steps, the controlled atmosphere sealed box operation of the multi-purpose furnace can be ensured to be safe and effective, providing a good experimental environment for the heat treatment of materials.

Site map

Copyright @ 2024 Jiangsu Kingkind Industrial Furnace Co., Ltd. All Rights Reserved

久久欧美综合中文| 69精品大片| 美女少妇久久内射| 久久九九精品免费| 人妻在线观看视频免费| 天堂资源成人在线| 草在线观看免费视频| 超碰精品| 精品一区至六区免费| 国产午夜av在线播放| 一区二欧美日韩| 少妇视频网站| 日本片一区二区三区| 欧美日韩无码照片| 有b吗?一区二区| 久久久大尺度| 国产88视频| 黑人大几八操逼| 青青草原在线高潮| 新搬来的白领邻居国产精品 | 久久久999区二区三区| 鲁一鲁一鲁一鲁一曰夜51社区| 人人爽人人操av| 亚洲精品久久久专区| 亚洲夫妻性爱视频| 本道久久综合亚洲| 伊人五月婷婷在线观看视频| 一区二区三区免费精品| 无码中文久久久| 麻豆内射视频| 精品亚洲区视频| 天天日天天艹天天日天天干| 欧美久久A国际精品| 人妻中英文字母片文字版在线| 欧美亚洲大片| 欧美日韩在线精品区| 日本二本道中文字幕免费专区| 色综合色综合色色综合色色色| 欧美日韩一级视频免费在线观看| 国产欧洲精品二级一区| 国产一区二区最新最全|